Follow us on

Goal Programme

Goal projects

Technical centre

  • Project approval date: 2012-03-27
  • Project location: El Salvador
  • Project description:
    Installation of a natural turf pitch. The project includes: full drainage, a perimeter wall, a paved path from the building to the pitches and a new unit with whirlpool and bathrooms
  • Goal project number: 4
  • Project status: Active
  • Objectives:
    The objectives of this project are:
    -to complete the infrastructure
    -to improve training with the use of modern sports equipment
Goal contribution500000
FAP contribution0
MA contribution0
Other contribution0
Total budget500000
ContractorsTotal amount
Desarrollos del Pacifico SA de CV, San Salvador475000
Arquitecto Edgar Adolfo Cabrerea, San Salvador25000
Total paid500000

Technical centre

  • Project approval date: 2011-02-28
  • Project location: El Salvador
  • Project description:
    Renovation of existing facilities. The project includes: fences, sports equipment, football pitches, dressing rooms and a cellar
  • Goal project number: 3
  • Project status: Active
  • Objectives:
    The objectives of this project are:
    -to complete the infrastructure
    -to protect the previous investment
    -to improve the training of the national teams
Goal contribution500000
FAP contribution0
MA contribution0
Other contribution0
Total budget500000
ContractorsTotal amount
Arquitecto Edgar Adolfo Cabrera25000
Desarrollos Del Pacifico S.A.475000
Total paid500000

Technical centre

  • Project approval date: 2009-06-02
  • Project location: San Salvador
  • Project description:
    Renovation of existing facilities. The project includes the upgrading of the hotel for the preparation of the national team
  • Goal project number: 2
  • Project status: Active
  • Objectives:
    The objectives of this project are:
    -to improve the technical centre
    -to improve players’ development and performance
    - to reduce accommodation costs
Goal contribution400000
FAP contribution0
MA contribution0
Other contribution0
Total budget400000
ContractorsTotal amount
Edgar Adolfo Cabrera Sanchez20000
Desarrollos del Pacifico380000
Total paid400000

Technical centre

  • Project approval date: 2001-07-04
  • Project location: San Salvador
  • Project description:
    Construction of a multifunctional area inside the technical centre. The project includes: a medical clinic, sports lockers and an auditorium
  • Goal project number: 1
  • Project status: Active
  • Objectives:
    The objectives of the project are:
    -to provide the association with facilities for different purposes
    -to improve medical assistance to national teams
    -to improve the preparation of national teams
    -to deliver headquarters and administrative offices befitting a football association
Goal contribution400000
FAP contribution152838
MA contribution0
Other contribution0
Total budget552838
ContractorsTotal amount
BioCon S.A.463851
Arq. L. Xiomara Campos de Andrade29520
Amendment contract BioCon S.A. (rediseno estructural)59467
Total paid552838