Technical centre
Project approval date: 2012-03-27
Project location: El Salvador
Project description:
Installation of a natural turf pitch. The project includes: full drainage, a perimeter wall, a paved path from the building to the pitches and a new unit with whirlpool and bathrooms
Goal project number: 4
Project status: Active
Objectives:
The objectives of this project are:
-to complete the infrastructure
-to improve training with the use of modern sports equipment
| Goal contribution | 500000 |
| FAP contribution | 0 |
| MA contribution | 0 |
| Other contribution | 0 |
| Total budget | 500000 |
| Contractors | Total amount |
|---|---|
| Desarrollos del Pacifico SA de CV, San Salvador | 405762 |
| Arquitecto Edgar Adolfo Cabrerea, San Salvador | 10000 |
| Total paid | 415762 |
Technical centre
Project approval date: 2011-02-28
Project location: El Salvador
Project description:
Renovation of existing facilities. The project includes: fences, sports equipment, football pitches, dressing rooms and a cellar
Goal project number: 3
Project status: Active
Objectives:
The objectives of this project are:
-to complete the infrastructure
-to protect the previous investment
-to improve the training of the national teams
| Goal contribution | 500000 |
| FAP contribution | 0 |
| MA contribution | 0 |
| Other contribution | 0 |
| Total budget | 500000 |
| Contractors | Total amount |
|---|---|
| Arquitecto Edgar Adolfo Cabrera | 25000 |
| Desarrollos Del Pacifico S.A. | 475000 |
| Total paid | 547500 |
Technical centre
Project approval date: 2009-06-02
Project location: San Salvador
Project description:
Renovation of existing facilities. The project includes the upgrading of the hotel for the preparation of the national team
Goal project number: 2
Project status: Active
Objectives:
The objectives of this project are:
-to improve the technical centre
-to improve players’ development and performance
- to reduce accommodation costs
| Goal contribution | 400000 |
| FAP contribution | 0 |
| MA contribution | 0 |
| Other contribution | 0 |
| Total budget | 400000 |
| Contractors | Total amount |
|---|---|
| Edgar Adolfo Cabrera Sanchez | 20000 |
| Desarrollos del Pacifico | 380000 |
| Total paid | 400000 |
Technical centre
Project approval date: 2001-07-04
Project location: San Salvador
Project description:
Construction of a multifunctional area inside the technical centre. The project includes: a medical clinic, sports lockers and an auditorium
Goal project number: 1
Project status: Active
Objectives:
The objectives of the project are:
-to provide the association with facilities for different purposes
-to improve medical assistance to national teams
-to improve the preparation of national teams
-to deliver headquarters and administrative offices befitting a football association
| Goal contribution | 400000 |
| FAP contribution | 152838 |
| MA contribution | 0 |
| Other contribution | 0 |
| Total budget | 552838 |
| Contractors | Total amount |
|---|---|
| BioCon S.A. | 463851 |
| Arq. L. Xiomara Campos de Andrade | 29520 |
| Amendment contract BioCon S.A. (rediseno estructural) | 59467 |
| Total paid | 552838 |